ISO/TC 67: Materials, Equipment and Offshore Structures for Petroleum

  API Staff Contact:

  David Miller
  American Petroleum Institute
  1220 L Street, NW
  Washington, DC 20005-4070
  P: 202-682-8159
  F: 202-962-4797
  E: miller@api.org

   Standards Committees    
    |  Updated: 7/2/08 4:48 PM [Image: Printer Friendly version.] Print version

  TC 67/SC 4 N Documents

  ISO TC/67 Home Page
  Open Ballots
  TC/67 N Documents
  TC 67/SC 4 N Documents
  Work Programme
  Organization
  Meetings
  Published Standards
  Project Numbers for AWI
  TC 67 Resource Links
 

  

Additional API Staff Contact: Shail Ghaey
American Petroleum Institute
1220 L Street, NW
Washington, DC 20005
P: 202-685-8056
F: 202-962-4797
E: ghaeys@api.org

 

Please contact the ISO/TC 67/SC 4 Secretariat if you need a copy of an N document that is not available electronically.

2007 N Documents


N#


Document description

Date circulated
US (API) national adoption of ISO Standards 2008-07-02
CEN TC 12 Report 2008-07-02
WG 1 Report 2008-07-02
Meeting Minutes and Resolutions of the 18th Plenary meeting of ISO TC 67/SC 4 -- Calgary, Alberta, Canada -- June 19/20 2008-07-02
ISO TC 67/SC 4 Meeting Attendance and Cards 2008-07-02
ISO/TC 67/SC 4 Interpretation Ballot for ISO 13628-4 2008-05-28
WG 6 Report 2008-05-28
WG 4 Report 2008-06-02
WG 3 Report 2008-05-28
WG 2 Report 2008-05-28
Report of the ISO/TC 67/SC 4 Secretariat 2008-05-29
2007 Systematic Review Results 2008-05-28
NWIP XXXXX, Insulation coatings wet insulators 2008-04-22
Agenda for Meeting of ISO/TC 67/SC 4 Drilling and production equipment
19/20 June 2008• Calgary, Alberta, Canada
2008-05-29
Calling notice and registration form for the 18th meeting of ISO/TC 67/SC 4 2008-04-11
Notification of Work Group Convenor change of ISO/TC 67/SC 4/WG 6 "Subsea Equipment" 2008-02-28
ISO/CD 28781, Petroleum and natural gas industries -- Downhole equipment -- Subsurface barrier valves and realted equipment
2008-02-25
REVISED: Results of NWIP 11353, Petroleum, petrochemical and natural gas industries — Recommended practice for flexible pipe ancillary equipment 2008-01-02
REVISED: Results of NWIP 11326, Petroleum, petrochemical and natural gas industries — Specification for flexible pipe ancillary equipment 2008-01-02
NWIP Compact flanged connections Patent notification 2007-12-18
Results of SO/CD 17078-4, Petroleum and natural gas industries — Downhole equipment — Part 4: Practices for side pocket mandrels and related 2007-09-10
Results of SO/CD 17824, Petroleum and natural gas industries — Downhole equipment — Sand control screens 2007-09-10
Report of the SC 4 Secretariat to the TC 67 Plenary Meeting 2007-09-10
Results of ISO NWIP 13628-15, Petroleum and natural gas industries - Design and operation of subsea production systems - Subsea structures and manifolds 2007-10-08
NWIP XXXXX, Petroleum, petrochemical and natural gas industries — Recommended practice for flexible pipe ancillary equipment 2007-08-17
NWIP XXXXX, Petroleum, petrochemical and natural gas industries — Specification for flexible pipe ancillary equipment 2007-08-17
Results of ISO DTR 13624-2, Petroleum and natural gas industries — Drilling and production equipment — Part 2: Deepwater drilling riser methodologies, operations, and integrity technical report 2007-09-10
Results of ISO NWIP XXXXX, Compact flanged connections 2007-07-24
API-CRE/ISO Process Guide 2007-07-09
ISO TC 67 and MC Activities Report 2007-07-09
ISO TC 67/SC 4 Meeting Attendance and Cards 2007-07-09
Meeting Minutes of the 17th Plenary meeting of ISO TC 67/SC 4 -- San Francisco -- June 21/22 2007-07-09
ISO/CD 17824, Petroleum and natural gas industries — Downhole equipment — Sand control screens 2007-04-26
ISO/CD 17078-4, Petroleum and natural gas industries — Downhole equipment — Part 4: Practices for side pocket mandrels and related 2007-04-26
ISO DTR 13624-2, Petroleum and natural gas industries — Drilling and production equipment — Part 2: Deepwater drilling riser methodologies, operations, and integrity technical report 2007-04-18
CEN TC 12 Liaison Report 2007-07-09
WG 6 Report 2007-04-16
WG 4 Report 2007-05-15
WG 3 Report 2007-04-16
WG 2 Report 2007-06-08
WG 1 Report 2007-06-18
Report of the ISO/TC 67/SC 4 Secretariat 2007-06-05
ISO NWIP XXXXX, Compact flanged connections 2007-03-26
ISO NWIP 13628-15, Petroleum and natural gas industries - Design and operation of subsea production systems - Subsea structures and manifolds 2007-03-08
Agenda for Meeting of ISO/TC 67/SC 4 Drilling and production equipment
21/22 June 2007 • San Francisco, California, USA
2007-03-05
Calling notice for the 17th meeting of ISO/TC 67/SC 4
2007-03-02
Results of voting on NWIP Amendments to 13628-1, Petroleum and natural gas inudstries - Design and operation of subsea production systems - Part 1: General requirements and recommendations
2007-02-23
TC 67 SC 4 Letter 14310 2001 Interpretation
2007-02-22
 

 

 

 
       
Helping You Get The Job Done Right.    Get Adobe Acrobat Reader  

  Antitrust Guidelines | Privacy Policy | Terms and Conditions | Copyright

  © 2002 - American Petroleum Institute. All rights reserved.
  1220 L Street, NW • Washington, DC 20005-4070 USA • 202-682-8000