| N
# |
Document description
|
Date
circulated |
|
Calling Notice ISO/TC 67/WG 2
meeting, January 2009 |
2008-11-19 |
|
|
Establishment
of Project Committee ISO/PC 246 Anti-counterfeiting tools |
2008-11-04 |
|
|
Business Cards
from the 28th Plenary Meeting of ISO/TC 67 |
2008-11-03 |
|
|
Resolutions
from the 28th Plenary meeting of ISO/TC 67, 29/30 October 2008, Beijing,
China |
2008-11-03 |
|
|
Draft Report
of the 28th Plenary meeting of ISO/TC 67, 29/30 October 2008, Beijing,
China |
2008-11-03 |
|
|
China Presentation
on Pumping Units |
2008-12-17 |
|
|
China Presentation
on Line Pipe |
2008-12-17 |
|
|
NWIP XXXXX,
Petroleum and natural gas industries — Aluminium alloy pipe
for use as tubing for wells |
2008-09-10 |
|
|
NWIP for the
revision of ISO 15546, Petroleum and natural gas industries —
Aluminium alloy drill pipe |
2008-09-10 |
|
|
Report on the
activities of the GSO TC 7 |
|
|
1039 |
Report on the
activities of the IADC |
|
|
|
Report on the
activities of the OGP Standards Committee |
2008-09-24 |
|
|
Report on the
activities of the CEN/TC234, Gas Infrastructure |
2008-10-20 |
|
|
Report on the
activities of CEN/TC 12 |
2008-09-02 |
|
|
Report on the
activities of the ISO Central Secretariat |
2008-09-02 |
|
|
Report of TC
67 Management Committee |
2008-09-19 |
|
|
Report of WG
10 LNG installations and equipment |
2008-09-05 |
|
|
Report of WG
8 Materials, Corrosion control, welding and joining and NDE |
2008-09-15 |
|
1031
1031 Add 1 |
Report of WG
7 Corrosion resistant materials |
2008-09-02 |
|
|
Report of WG
5 Aluminum alloy pipe |
2008-09-08 |
|
|
Report of WG
4 Reliability engineering & technology |
2008-09-02 |
|
|
Report of WG
2 Conformity assessment |
2008-09-12 |
|
|
Report of ISO/TC
67/SC 7 Offshore structures |
2008-09-08 |
|
|
Report of ISO/TC
67/SC 6 Processing equipment and systems |
2008-09-02 |
|
|
Report of ISO/TC
67/SC 5 Casing, tubing, and drill pipe |
2008-09-05 |
|
|
Report of ISO/TC
67/SC 4 Drilling and production equipment |
2008-09-11 |
|
|
Report of ISO/TC
67/SC 3 Drilling and completion fluids and well cements |
2008-09-02 |
|
|
Report of ISO/TC
67/SC 2 Pipeline transportation systems |
2008-09-12 |
|
|
New work items
since 27th meeting |
2008-09-19 |
|
|
Actions from
the 27th meeting (Reading, UK) |
2008-09-19 |
|
|
Status of TC
67 work programme |
2008-09-19 |
| |
Report of the
Secretariat |
2008-09-19 |
|
|
REVISED Report
of the 27th Meeting of ISO/TC 67 |
2008-08-15 |
|
|
Revised
Draft agenda for the 28th plenary meeting, 29/30 October 2008, Beijing,
China |
2008-08-15 |
|
1016
1016 CD Rev
1016 Ballot
Form |
ISO/CD 21457,
Petroleum, petrochemical and natural gas industries -- Materials selection
and corrosion control for oil and gas production systems |
2008-07-28 |
|
|
Nomination
for Chairman to ISO/TC 67/SC 4 Drilling and Production Equipment
Extension of term of ISO/TC 67/SC 5 Chairman to Casing, Tubing, and
Drill Pipe
|
2008-07-28 |
|
|
Logistics for
the 28th Plenary Meeting of ISO/TC 67 - 29-30 October, 2008, Beijing,
China |
2008-05-09 |
|
|
Report of the
ISO/TC 67 Secretariat to the Annual Meeting of CEN TC 12 |
2008-03-21 |
|
|
NWIP, Petroleum,
petrochemical and natural gas industries -- Reliability modelling
and calculation of safety systems |
2008-03-19 |