| N
# |
Document
description |
Date
circulated |
| |
WG 2 report to ISO/TC 67, November 2002 |
2002-12-04 |
| |
Proposal to revise 67 N 435 to include guidance on dual references |
2002-11-19 |
|
Circulation of new work item proposal from ISO/TC 38 for information |
2002-11-12 |
| |
ISO-API Pilot project
Annex A - ISO-API Pilot rationale
Annex B - Text of API RP 17B and ballot form
Annex C - Text of API Spec 17J and ballot form
Annex D - Text of API Spec 17K and ballot form
“Permission is granted by the American Petroleum Institute
to electronically reproduce these API publications for the purpose
of review and comment related to the preparation of the national
member body position of ISO/TC 67, provided this notice is included.
All other rights are reserved.”
|
2002-10-24 |
|
Livelink presentation |
2002-10-15 |
| |
Attendees of the 22nd meeting |
2002-10-15 |
|
Draft report of the 22nd meeting |
2002-10-15 |
| |
Resolutions of the 22nd meeting
Projets de résolutions de la 22ême réunion
de l'ISO/TC 67
|
2002-10-15 |
|
OGP Standards Committee report |
2002-10-15 |
| |
Report of the Secretariat on the activities of the Management Committee |
2002-08-12 |
|
New work items since 2001-09-01 |
2002-08-12 |
| |
Status of draft resolutions of the 21st meeting of ISO/TC 67 |
2002-08-12 |
|
ISO/TC 67 Work in progress |
2002-08-12 |
| |
Report of the Secretariat to the Copenhagen meeting of ISO/TC
67
Revised report circulated 2002-10-15
|
2002-08-12 |
|
CEN/TC 12 report |
2002-08-12 |
| |
Report of SC 7, Offshore structures
Revised report circulated 2002-10-15
|
2002-08-23 |
|
Report of SC 6, Processing equipment and systems
Annex B (meeting presentation) circulated 2002-10-15
|
2002-08-12 |
| |
Report of SC 5, Casing, tubing and drill pipe |
2002-08-12 |
|
Report of SC 4, Drilling and production equipment
Revised Annex A circulated 2002-10-15
|
2002-08-12 |
| |
Report of SC 3, Drilling and completion fluids and well cements |
2002-08-12 |
|
Report of SC 2, Pipeline transportation systems |
2002-08-12 |
| |
Report of WG 7, Materials for use in H2S containing environments
in oil and gas production
Annex A (meeting presentation) circulated 2002-10-15
|
2002-08-23 |
|
Report of WG 5, Aluminium alloy pipes |
2002-08-12 |
| |
Report of WG 4, Data collection
Annex C (meeting presentation) circulated 2002-10-15
|
2002-08-12 |
|
Report of WG 2, Conformity assessment |
2002-08-12 |
| |
Draft agenda for the 22nd plenary meeting of ISO/TC 67 |
2002-08-12 |
|
Results of Voting on New Work Item Proposal N 798 |
2002-08-12 |
| |
NWI proposal: P&ngi - Sector-specific quality management
systems - Requirements for product and service supply organizations |
2002-03-26 |
|
Result of voting on NWI N 788, P&ngi - Collection and storage
of reliability and maintenance data for equipment [Revision of
ISO 14224:1999] |
2002-02-15 |
| |
Ballot results on 67 N 791 |
2002-02-15 |
|
Ballot results on 67 N 790 |
2002-02-15 |
| |
Report of the ISO/TC 67 Secretariat to CEN/TC 12 |
2002-01-24 |
|
Ballot results on ISO/TC 67 N 785, proposal to approve ISO/TC
67 N 654, Revision 5, ISO/TC 67 Management system
Revised ballot results circulated 2002-01-17 |
2002-01-16 |
| |
Ballot results on ISO/TC 67 N 784, proposal to approve TC 67
N 435 Revision 4, ISO/TC 67 Policies and procedure guide
Revised ballot results circulated 2002-01-17
|
2002-01-16 |