| N
# |
Document
description |
Date
circulated |
|
Ballot to approve TC 67 draft interpretation process
to be included in next revision of N 435 |
2001-12-21 |
| |
Ballot to approve TC 67 EC recommendation to transfer
SC 1 documents to SC 2 |
2001-12-21 |
|
Result of voting on NWI N 777, P&ngi - Downhole
equipment - Subsurface safety valve equipment [Revision of ISO
10432:1999] |
2001-12-10 |
| |
NWI proposal to revise ISO 14224:1999, P&ngi -
Collection and exchange of reliability and maintenance data for equipment |
2001-11-12 |
|
API moves to electronic communication |
2001-10-09 |
| |
Result of voting on N 753, NWI on External pipeline
coatings |
2001-10-04 |
|
Ballot to approve TC 67 N 654, Revision 5, "ISO/TC
67 Management system" |
2001-10-05 |
| |
Ballot to approve TC 67 N 435, Revision 4, "ISO/TC
67 Policies and procedures guide" |
2001-10-05 |
|
Attendance at the 21st plenary meeting of ISO/TC 67 |
2001-10-04 |
| |
Draft minutes from the 21st plenary meeting of ISO/TC
67 |
2001-10-04 |
|
Resolutions from the 21st plenary meeting of ISO/TC
67 (English or French) |
2001-10-04 |
| |
Result of voting on N 750 (revised results) |
2001-09-07 |
|
TC 67 Business plan
Revised Business Plan circulated 2002-06-20 |
2001-08-31 |
| |
MOU with TC 8/TC 67 |
2001-08-31 |
|
Circulation of NWI, P&ngi - Downhole equipment
- Subsurface safety valve equipment [Revision of ISO 10432:1999]
|
2001-08-16 |
| |
Proposal regarding the balloting of new work items |
2001-08-10 |
|
EC/MC Report |
2001-08-10 |
| |
Report of WG 9 |
2001-08-10 |
|
Report of WG 8 |
2001-08-10 |
| |
Report of WG 7 |
2001-08-10 |
|
Report of WG 5 |
2001-08-10 |
| |
Report of WG 4 |
2001-08-10 |
|
Report of WG 2 |
2001-08-10 |
| |
Action items of the 20th meeting |
2001-08-10 |
|
CEN/TC 12 Report
Revision of CEN/TC 12 Report circulated 2001-10-04 |
2001-08-10 |
| |
Report of SC 7
Revision of SC 7 report circulated 2001-10-04 |
2001-08-10 |
| |
Report of SC 6
Revision of SC 6 report circulated 2001-10-04 |
2001-08-10 |
| |
Report of SC 5 |
2001-08-10 |
|
Report of SC 4
Revision of SC 4 report circulated 2001-10-04 |
2001-08-10 |
| |
Report of SC 3 |
2001-08-10 |
|
Report of SC 2 |
2001-08-10 |
| |
Report of SC 1 |
2001-08-10 |
|
Work programme status |
2001-08-10 |
| |
New work items since 20th meeting |
2001-08-10 |
|
Report of the Secretariat to ISO/TC 67 |
2001-08-10 |
| |
Result of voting on 67 N 748, P&ngi - Pipeline
transportation systems - Testing procedures for mechanical connections |
2001-07-24 |
|
Additional information regarding the 2001-09 TC 67
plenary meeting |
2001-07-18 |
| |
Result of voting on 67 N 747, P&ngi
- Drill pipe with weld-on tool joints [Rev. of ISO 11961] |
2001-07-18 |
|
NWI on External pipeline coatings |
2001-06-25 |
| |
Meeting information for the 2001 September plenary
meeting |
2001-06-11 |
|
Draft agenda for 2001 September ISO/TC 67 plenary meeting |
2001-06-11 |
| |
Circulation of NWI, P&ngi - Foam cement testing |
2001-05-14 |
|
Circulation of voting results; NWI N 742, Regularity
management and reliability technology |
2001-05-08 |
| |
Circulation of NWI, P&ngi - Pipeline transportation
systems - Testing procedures for mechanical connections |
2001-04-20 |
|
Circulation of NWI, P&ngi - Drill pipe with
weld-on tool joints [Rev. of ISO 11961] |
2001-04-09 |
| |
Circulation of results; NWI on ISO 13628-6
Revised voting results; NWI on ISO 13628-6 circulated 2001-04-03
|
|
|
Circulation of results; NWI on ISO 10426-3 |
2001-03-05 |
| |
Voting results on N 735, API-ISO Pilot project selection
criteria |
2001-01-31 |
|
TC 67 report to CEN/TC 12 meeting |
2001-01-18 |
| |
Circulation of NWI on Regularity management and reliability
technology |
2001-01-25 |