Committee on Refining Equipment
CRE ISO/TC 67 TDC Resources & Links Rosters

  API Staff Contact:

   Gordon Robertson
  American Petroleum Institute
  1220 L Street, NW
  Washington, DC 20005-4070
  P: 202-682-8190
  F: 202-962-4797
  E: robertsong@api.org

   My API Committees  |  Standards Committees  
    |  Updated: 12/1/08 9:00 AM [Image: Printer Friendly version.] Print version

  Subcommittee on Piping & Valves

  Corrosion & Materials
  Electrical Equipment
  Heat Transfer Equipment
  Inspection
  Instruments & Cntrl Sys
  Mechanical Equipment
  Piping & Valves
  Pressure Relieving Sys
  Aboveground Tanks
  Fitness-for-Service
  Risk-Based Inspection

  
 

MEETING INFORMATION

Manufacturers and Contractors Waiting List (12-08)

Fall 2008 Meeting Minutes    
M &C Meeting Minutes    
     

Fall 2008 Meeting Agendas    
M & C Agenda   Joint Meeting Agenda
Gate Valve Agenda    

Spring 2008 Meeting Minutes    
Manufacturers and Contractors   Joint Meeting Minutes ATTACHMENTS
     

 

Spring 2008 Agendas    
Manufacturers and Contractors   Quarter Turn Agenda
Joint Piping Agenda   Gate Valves Agenda

API 600 Ballot Results (posted 4-4-08)

API 600 Ballot Comments (posted 4-4-08)

Fall 2007 Meeting Minutes    
Manufacturer and Contractors Meeting Minutes    Joint Meeting Minutes
 Gate Valve Minutes    Quarter Turn Minutes
 MSS Report    B16 Liaison Report
Counterfeit Valves Presentation    ISO 5208 Leak Rates

 

Fall 2007 Agendas    
Executive Session Agenda   Joint Meeting Agenda
Quater Turn Agenda   Gate Agenda
Standards Status and Schedule   Manufacturers and Contractors Agenda

 

Spring 2007 Meeting Minutes    
Manufacturers and Contractors Meeting Minutes   MSS Report Quarter Turn Minutes Joint Meeting Minutes
Gate Valves Report B.16 Report B31.3 Report   SCOPV Inquiry Process (updated Spring 2007)
     
Fall 2006 Meeting Minutes    
SCOPV MEETING MINUTES AND REPORTS COLLECTIVELY (Zip File)   Fall 2006 M/C Meeting Minutes and Attachments
Fall 2006 Gate Valve Meeting Minutes    
     
Spring 2006 Meeting Minutes    
Joint Meeting Minutes   Gate Valve Meeting Minutes
Quarter Turn Meeting Minutes   Spring 2006 M/C meeting minutes
MSS Report B31.3 Liasion Report   API B16 Liasion Report
Joint Meeting attendance    
     
Fall 2005 Meeting Minutes    
M & C Meeting Minutes   Joint Meeting Minutes
A-2 Agenda   A-1 Sign in Sheet
A-3 Voting Membership   A-4 API 621 Ballot
A-5 API 622 Ballot A-6 API 622 Comments   A-7 M-C Minutes
A-8 MSS Report   A-9 b31.3 Report
   
Spring 2005 Meeting Minutes    
Spring 2005 M/C Meeting Minutes   Spring 2005 Joint Meeting Minutes
Attachment 1 Attendance   Attachment 2 Agenda
Attachment 3 Valve Fugitive Emissions   Attachment 4 Valve Casting Quality Tests
Attachment 5 MSS Report   Attachment 6 B31.3 Liasion Report
     

 

 
       
Helping You Get The Job Done Right.    Get Adobe Acrobat Reader  

  Antitrust Guidelines | Privacy Policy | Terms and Conditions | Copyright

  © 2002 - American Petroleum Institute. All rights reserved.
  1220 L Street, NW • Washington, DC 20005-4070 USA • 202-682-8000