Committee on Refining Equipment
CRE ISO/TC 67 TDC Resources & Links Rosters

  API Staff Contact:

  Stephen Crimaudo
  American Petroleum Institute
  1220 L Street, NW
  Washington, DC 20005-4070
  P: 202-682-8151
  F: 202-962-4797
  E: crimaudos@api.org

   My API Committees  |  Standards Committees  
    |  Updated: 4/10/08 2:55 PM [Image: Printer Friendly version.] Print version

  Subcommittee on Corrosion & Materials

  Corrosion & Materials
  Electrical Equipment
  Heat Transfer Equipment
  Inspection
  Instruments & Cntrl Sys
  Mechanical Equipment
  Piping & Valves
  Pressure Relieving Sys
  Aboveground Tanks
  Fitness-for-Service
  Risk-Based Inspection

  
 

BALLOTS

API Balloting System

Ballot Results

Spring 2008 Ballot Results (posted 4-10-2008)

API 936 3rd Edition - Ballot 936-01-05 Results


The following ballots have been issued:

SCCM - Subcommittee on Corrosion & Materials

Ballot IDStatusResultsOpensClosesDescription
1484ClosedPass8/1/20089/5/2008Ballot to review API Technical Report 934-D
1486ClosedPass8/12/20089/5/2008Ballot to review First Draft of RP 934-E
1491ClosedResolution Required8/22/20089/8/2008Ballot to review API 934-A, New Appendix A
1555ClosedResolution Required10/21/200812/2/2008Re-Ballot of RP 939-C, Sulfidation - Version 5
End of available ballot list.

 
       
Helping You Get The Job Done Right.    Get Adobe Acrobat Reader  

  Antitrust Guidelines | Privacy Policy | Terms and Conditions | Copyright

  © 2002 - American Petroleum Institute. All rights reserved.
  1220 L Street, NW • Washington, DC 20005-4070 USA • 202-682-8000