Committee on Refining Equipment
CRE ISO/TC 67 TDC Resources & Links Rosters

  API Staff Contact:

  Stephen Crimaudo
  American Petroleum Institute
  1220 L Street, NW
  Washington, DC 20005-4070
  P: 202-682-8151
  F: 202-962-4797
  E: crimaudos@api.org
 
   My API Committees  |  Standards Committees  
    |  Updated: 8/20/09 11:27 AM [Image: Printer Friendly version.] Print version

  Subcommittee on Pressure- Relieving Systems

  Corrosion & Materials
  Electrical Equipment
  Heat Transfer Equipment
  Inspection
  Instruments & Cntrl Sys
  Mechanical Equipment
  Piping & Valves
  Pressure Relieving Sys
  Aboveground Tanks
  Fitness-for-Service
  Risk-Based Inspection

  
 

Meeting Information

Spring 2009
April 26-29, 2009, Denver, CO

PRS Joint Meeting Minutes
Attachment 1 - Joint Meeting Attendance Sheet
Attachment 2 - RP 520 Task Force Minutes
Attachment 3 - Std 521/ISO 23251 Task Force Minutes
Attachment 4 - Std 2000 Task Force Minutes

Task Force on Standard 526/527 Agenda

Fall 2008
November 10-12, 2008, Los Angeles, CA

PRS Joint Meeting Minutes
Attachment 1- RP 520 Task Force Minutes
Attachment 2- Std 521/ISO23251 Task Force Meeting Minutes
Attachment 3 - RP 2000 Task Force Minutes
Attachment 4 - Task Force on Standard 526/527 Minutes

Spring 2008
April 14-17, 2008, New Orleans, LA

PRS Joint Meeting Minutes
Izuchi Presentation
Task Force on 520 Meeting Minutes

Fall 2007
September 17 - 19, 2007, San Antonio, TX

Task Force on RP 520 Meeting Minutes

Spring 2007
April 16-18, 2007, Sheraton Seattle Hotel & Towers, Seattle, WA

PRS Joint Meeting Minutes
Attachment 1 - Joint Meeting Attendance Sheet
Attachment 2 - RP 520 Task Force Minutes
Attachment 3 - Std 521/ISO 23251 Task Force Minutes
Attachment 4 - Std 2000 Task Force Minutes

Fall 2006
October 30-November 1, 2006, Renaissance Parc 55, San Francisco, CA

PRS Joint Meeting Minutes
Attachment 1 - Joint Meeting Attendance Sheet
Attachment 2 - Std 521/ISO 23251 Working Group Minutes
Attachment 3 - Std 526/527 Task Force Minutes
Attachment 4 - Std 2000 Task Force Minutes
Attachment 5 - Gas Turbine Spray Dynamics & Combustion Presentation

Spring 2006
May 1-3, 2006, Hyatt Regency, Dallas, TX

PRS Joint Meeting Minutes
Attachment 1 - Joint Meeting Attendance Sheet
Attachment 2 - Control Valve Bypass Premises Survey
Attachment 3 - RP 520 Task Force Minutes
Attachment 4 - RP 521 Task Force /ISO 23251 Working Group Minutes
Attachment 5 - Interstage Relief Issues with Reciprocating Compressors
Attachment 6 - Certified PRV Sizing Isues
Attachment 7 - Acoustic vs. Turbulence Induced Piping Fatigue
Attachment 8 - Flare Knockout Drum Internals
Attachment 9 - Visund Gas Leak

Fall 2005
November 14-16, 2005, Hyatt Regency, Chicago, IL

PRS Joint Meeting Minutes
Attachment 1 - Joint Meeting Attendance Sheet
Attachment 2 - RP 520 Task Force Minutes
Attachment 3 - Back Pressure Presentation


Spring 2005

April 18-20, 2005, Hilton New Orleans Riverside, New Orleans, LA

PRS Joint Meeting Minutes
Attachment 1 - Joint Meeting Attendance Sheet
Attachment 2 - Joint Meeting Agenda
Attachment 3 - RP 520 Task Force Minutes
Attachment 4 - Superimposed Backpressure on the Opening Pressure of a Balanced Bellows Relief Valve
Attachment 5 - Summary on the Inter-relationship of Superimposed Backpressure, Set Pressure, and Device Capacity of a Balanced Bellows Valve
Attachment 6 - Selection of Two-Phase Flow Methods for ERS Design

Fall 2004
October 25-27, 2004, Manchester Grand Hyatt, San Diego, CA

PRS Joint Meeting Minutes - Fall 2004
Attachment 1 - RP 520 Task Force Minutes
Attachment 2 - RP 520 Meeting Attendance Sheet
Attachment 3 - Test Data for Bellows Relief Valve 26HB

Spring 2004
May 17-19, 2004, Hyatt Regency Atlanta, Atlanta, GA

PRS Joint Meetng Minutes - Spring 2004
Attachment 1 - Joint Meeting Attendnace Sheets
Attachment 2 - RP 520 Task Force Minutes
Attachment 3 - Code Case 2211
Attachment 4 - Bellows Performance
Attachment 5 - Backpressure Effects on API 526 Safety Valves
Attachment 6 - API RBI PRD Module Update
Attachment 7 - ISO Proposal

Fall 2003
September 15-17, 2003, Adam's Mark Hotel, Denver, CO

PRS Joint Meeting Minutes - Fall 2003
Attachment 1 - Joint Meeting Attendance Sheets
Attachment 2 - Developing API/ISO Standards
Attachment 3 - Preliminary PRV Survey Results
Attachment 4- Modulating PRV Performance Data

Spring 2003
April 14-16, 2003, Sheraton Hotel & Towers, Seattle, WA

PRS Joint Meeting Minutes - Spring 2003
Attachment 1 - Joint Meeting Attendance Sheet
Attachment 2 - Joint SCPRS Roster
Attachment 3 - RP 520 Task Force Minutes
Attachment 4 - RP 521 Task Force Minutes
Attachment 5 - Vessel Failures Presentation

 
       
Helping You Get The Job Done Right.    Get Adobe Acrobat Reader  

  Antitrust Guidelines | Privacy Policy | Terms and Conditions | Copyright

  © 2002 - American Petroleum Institute. All rights reserved.
  1220 L Street, NW • Washington, DC 20005-4070 USA • 202-682-8000